LNCD

Table of Contents

  • LNCD Home
  • Administration
  • Notebooks
  • Journal Club Presentations
  • Publications
  • Current Projects
  • Completed Projects
  • Current Grants
  • Datasets by Project
  • Brain ROIs and Measures
  • ️Tools And Methods
  • Big Data
  • RA Homepage
  • Undergrad Resources
  • Recent Changes
  • Maintenance
  • Site Map
  • Random Page
LNCD
Admin » Pittsburgh Super Computer

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
tools:psc [2026/06/01 15:33] – [Checking hour allocations] willtools:psc [2026/06/01 15:33] (current) – [Checking hour allocations] will
Line 62: Line 62:
 ===== Checking hour allocations ===== ===== Checking hour allocations =====
  
-To check the hours of specific job (also see [[:tools:usage_profiling]] <code> sacct -j <job name>.batch --format=JobID,MaxRSS,AveRSS,TotalCPU </code>+To check the hours of specific job (also see [[:tools:usage_profiling]]) <code> sacct -j <job name>.batch --format=JobID,MaxRSS,AveRSS,TotalCPU </code>
  
 To check the hours in general: <code> projects </code> To check the hours in general: <code> projects </code>